13-10-2026 13:00
via
toledoblade.com
Ramaswamy wants to speed up Toledo-Columbus freeway project
A final feasibility study assumes construction of a new freeway link between Toledo and Columbus won’t begin until 2035, but one gubernatorial candidate wants to speed up that timetable.
Read more »
Toledo news
City Council debates terminating Flock contracts, expanding guardrails
Courthouse to reopen after water repair
St. John’s Jesuit opens doors to students with disabilities through new program
St. John’s Jesuit opens doors to students with disabilities in new program
RCO Law, Marshall & Melhorn to merge in 2027
Commissioners crack down on over-budget spending, eyeing prosecutor
Perrysburg to hold open house for water project
Penta students get a firsthand look at careers in the trades
Toledo sets high-temperature record Tuesday
Toledo breaks 91-year-old heat record as temperatures soar across region
Utility work closes part of Hamilton Street
Electrical project to involve backyard rights-of-way
Proposed pilot program would reduce Ohio energy costs, advocates say
Pig Fest celebrates Toledo’s creativity, appetite, and a flying-pig story
Desktop versie