Canadian Renewables Drive Second-Quarter Power Project Starts
April 21, 2025--Researched by Industrial Info Resources (Sugar Land, Texas)--Canada is building out its power-generation sector with a variety of resources. Industrial Info is tracking more than US$6.4 billion worth of power-generation projects that are planned to begin construction in Canada before the end of the second quarter, about half of which is attributed to projects with a medium-to-high (70% or more) likelihood of beginning construction as scheduled, according to Industrial Info's Glob