Sisk confirmed for £280m Battersea Power Station resi job
Battersea Power Station has confirmed Sisk will deliver the next residential phase of the massive redevelopment project in London
Sisk will start work this summer on Phase 3C, the final two Frank Gehry-designed buildings that will complete Electric Boulevard.
The project is expected to carry a build cost of £250m–£280m and includes a substantial basement and podium structure supporting two buildings rising to 15 storeys.Phase 3C is expected to create around 400 construction job