Construction moves indoors as Lambton College residence reaches key watertight phase
With windows in and the building officially watertight, construction on Lambton College’s new student residence has shifted into high gear inside.Tilbury Properties Corporation Partner Michael Kaye said it's been a very busy site this summer."Since topping off, we are now technically watertight," Kaye said. "All of the windows have been installed, the glass curtain walls both running up the side of the building from the second floor to the fifth floor on the front of the building, as